Skip to content
Hybrid Power for Mining

HYBRID POWER
FOR QLD MINING

Hybrid Power Australia specialises in delivering integrated hybrid energy systems to Queensland mine sites — combining diesel generators, solar PV, and battery storage into a single intelligent power solution. Purpose-built for the Bowen Basin, Surat Basin, and North West Queensland's remote operations.

The Full Picture

A COMPLETE HYBRID ENERGY SYSTEM

A hybrid power system for mining isn't just a generator with a battery bolted on. It's a carefully engineered integration of energy sources — each managed by an intelligent controller that decides, in real time, which source delivers power and when. HPA designs, supplies, deploys, and maintains these systems so your team doesn't have to think about power.

Our hybrid systems have been proven on Bowen Basin coal mine sites where diesel costs were running at $84,104 per year. After hybrid integration, the same sites reduced fuel spend by up to 96% — while maintaining 100% power availability.

Up to 96% Fuel Reduction

Proven on QLD coal mine sites

100% Availability

No compromise on power reliability

Intelligent Control

Automated energy dispatch — no manual switching

Remote Monitoring

HPA watches your system 24/7

Get a Hybrid Power Assessment

Cost Comparison

Based on actual HPA hybrid system data at $3/L diesel

Diesel-only annual fuel cost $84,104
HPA hybrid annual fuel cost $2,814
Annual saving $81,290
QLD Regions We Serve

HYBRID POWER ACROSS QUEENSLAND

HPA delivers hybrid power systems to mine sites and energy projects across Queensland's major resource regions — from the Bowen Basin to the far North West.

BOWEN BASIN

Emerald, Moranbah, Blackwater, Middlemount, Dysart, Clermont — the heart of Queensland's coal industry and HPA's core territory.

SURAT BASIN

Chinchilla, Taroom, Roma — Queensland's coal seam gas heartland where remote operations demand reliable, fuel-efficient power.

NORTH WEST QLD

Mount Isa, Cloncurry, and the North West Minerals Province — remote operations where fuel logistics make hybrid power even more valuable.

Why Choose HPA

BUILT FOR QUEENSLAND MINING

24/7 SUPPORT

Round-the-clock technical support and field service response across Queensland mine sites.

UP TO 50% FUEL SAVINGS

Proven hybrid and renewable systems that dramatically cut diesel consumption and operating costs.

QLD-WIDE DELIVERY

Fleet delivered and commissioned across the Bowen Basin, North Queensland, and remote regions.

ZERO DOWNTIME FOCUS

Redundant power design and proactive maintenance to keep your site running without interruption.

Common Questions

FREQUENTLY ASKED

The key indicator is your current diesel generator load factor — if your generators regularly run below 60% of rated capacity, hybrid power will deliver significant savings. HPA conducts a free load assessment using your existing fuel consumption data to quantify the savings potential before you commit.

Yes. HPA's hybrid systems are designed with redundancy — the diesel generator provides backup whenever the battery or solar cannot cover site load. The system is engineered for 100% power availability, not just fuel savings.

In many cases, yes. HPA can add battery storage and energy management systems to existing diesel generator infrastructure, converting a conventional setup into a hybrid system. The viability depends on your current generator specifications — contact us for a free assessment.

HPA provides 24/7 remote monitoring, scheduled preventive maintenance, field service response for any faults, and monthly energy performance reporting. Our team proactively manages the system so you can focus on mining, not power management.

READY TO CUT FUEL COSTS?

Talk to our team about the right solution for your mine site. We'll assess your load profile, run the numbers, and deliver a solution that saves you money from day one.