Skip to content
Renewable Energy Hire

RENEWABLE ENERGY
EQUIPMENT HIRE QLD

Hybrid Power Australia delivers fully integrated renewable energy systems to Queensland mine sites, gas fields, and remote construction projects. Solar, wind, and hybrid configurations — designed to slash your diesel bill and reduce your carbon footprint without sacrificing reliability.

Solar Power Systems

SOLAR ARRAYS FOR MINE SITES

Industrial-grade solar PV arrays sized for remote mine site loads — from small instrumentation systems to full site power generation. HPA supplies, delivers, and commissions solar arrays complete with mounting infrastructure, cabling, and integration into your existing power system.

Our solar hire packages are engineered for the harsh Queensland climate — UV-stable panels, dust-rated enclosures, and wind-rated mounting systems designed to perform through wet season storms and dry season heat.

10kW – 1MW+

Scalable capacity for any site load

Grid-Tie or Off-Grid

Works with or without a grid connection

Remote Monitoring

Live generation and fault reporting

Rapid Deployment

Site-ready in days, not weeks

Enquire About Solar Hire
Wind & Hybrid Systems

INTEGRATED RENEWABLE SOLUTIONS

For sites that need 24/7 renewable input, HPA combines solar, wind, battery storage, and hybrid generators into a single managed energy solution — fully commissioned and monitored by our team.

SOLAR + BATTERY

Solar PV paired with lithium battery storage for sites requiring reliable 24-hour power with minimal diesel backup.

SOLAR + HYBRID GEN

Solar arrays integrated with our intelligent hybrid generators — the generator only runs when the sun can't cover the load.

FULL MICROGRID

Complete renewable microgrid solutions for large sites — solar, wind, battery, and generator backup in a single integrated system.

Why Choose HPA

BUILT FOR QUEENSLAND MINING

24/7 SUPPORT

Round-the-clock technical support and field service response across Queensland mine sites.

UP TO 50% FUEL SAVINGS

Proven hybrid and renewable systems that dramatically cut diesel consumption and operating costs.

QLD-WIDE DELIVERY

Fleet delivered and commissioned across the Bowen Basin, North Queensland, and remote regions.

ZERO DOWNTIME FOCUS

Redundant power design and proactive maintenance to keep your site running without interruption.

Common Questions

FREQUENTLY ASKED

It depends on your load profile, location, and available space. Many mine sites run hybrid configurations — solar and battery cover the base load during daylight hours, with a hybrid generator on standby for peak periods or overnight. HPA will conduct a free load assessment to determine the right mix.

Small to medium solar arrays (up to 100kW) can typically be commissioned within 3–5 days of delivery. Larger systems may take 1–2 weeks depending on site conditions and cabling requirements. HPA handles the full deployment.

In most cases, temporary renewable installations on private mine sites do not require planning approval, but electrical connection work must be carried out by a licensed electrician. HPA can manage all commissioning and compliance requirements.

Solar output reduces in low-light conditions. This is why HPA recommends hybrid solar-generator systems — the generator automatically picks up the load when solar generation drops below site demand, ensuring uninterrupted power at all times.

READY TO CUT FUEL COSTS?

Talk to our team about the right solution for your mine site. We'll assess your load profile, run the numbers, and deliver a solution that saves you money from day one.