MINING PROJECT
POWER SOLUTIONS QLD
From exploration camp to full production — Hybrid Power Australia delivers complete power solutions for Queensland mining projects at every stage. Long-term hire packages, scalable capacity, and on-the-ground support from a team that understands the demands of remote mine site operation.
POWER FROM DAY ONE
Mining projects evolve — and your power solution needs to evolve with them. HPA supplies scalable power packages that grow with your site. Exploration camps start with compact, quiet generators. As construction ramps up, we add capacity. When production begins, we transition to a high-availability hybrid or renewable system matched to your permanent load profile.
All hire agreements include proactive maintenance, remote monitoring, and field service support — so your power supply is never the reason a project stalls.
Exploration Camps
Compact, quiet, fuel-efficient units
Construction Phase
High-capacity paralleled generator sets
Production Phase
Hybrid and renewable integration
Long-Term Rates
Better value on 6-month+ agreements
EXPLORATION
Portable 10–50kVA generators. Silent canopy options. Easy relocate between drill pads.
CONSTRUCTION
100–1400kVA paralleled diesel. Distribution boards, cabling, full site power design.
PRODUCTION
Hybrid generator and renewable integration. Remote monitoring. Long-term optimised rates.
THE BENEFITS OF HIRE OVER PURCHASE
Capital equipment purchases tie up project finance and create long-term maintenance obligations. Long-term hire gives you the reliability of owned equipment with the flexibility of a hire arrangement.
NO CAPEX
Generator hire is an operating expense — keep your project capital for where it matters. No large up-front equipment purchase required.
MAINTENANCE INCLUDED
All servicing, parts, and repairs are HPA's responsibility on hire equipment. No surprise maintenance costs, no downtime from equipment failures.
SCALABLE UP OR DOWN
As your project's power needs change, HPA adjusts your fleet. Add capacity during construction peaks, scale back during slower phases.
BUILT FOR QUEENSLAND MINING
24/7 SUPPORT
Round-the-clock technical support and field service response across Queensland mine sites.
UP TO 50% FUEL SAVINGS
Proven hybrid and renewable systems that dramatically cut diesel consumption and operating costs.
QLD-WIDE DELIVERY
Fleet delivered and commissioned across the Bowen Basin, North Queensland, and remote regions.
ZERO DOWNTIME FOCUS
Redundant power design and proactive maintenance to keep your site running without interruption.
FREQUENTLY ASKED
HPA offers short-term hire from as little as one week, but our most cost-effective long-term rates apply to agreements of 3 months or more. Long-term project hire also gives you priority fleet availability.
Yes. HPA services remote Queensland locations including sites in the Mount Isa region, Cloncurry, Longreach, and other remote areas. We factor fuel and transport logistics into our project planning at the start.
Yes. We regularly supply separate power systems for the accommodation camp and the processing or operational areas — each sized and configured for the specific load profile.
HPA provides all relevant equipment documentation including test certificates, compliance records, and operation manuals. Our commissioning process includes a full handover briefing for your site safety officer.
READY TO CUT FUEL COSTS?
Talk to our team about the right solution for your mine site. We'll assess your load profile, run the numbers, and deliver a solution that saves you money from day one.